ESBC Library

Refurbishment of an existing retail unit, with the space reconfigured to accommodate both a new public library and a Decathlon retail unit

WhatsApp Image 2025-08-18 at 15.56.23
previous arrowprevious arrow
next arrownext arrow
WhatsApp Image 2025-08-18 at 15.56.23
WhatsApp Image 2025-08-18 at 15.56.24 - Copy
WhatsApp Image 2025-08-18 at 15.56.24 (1)
WhatsApp Image 2025-08-18 at 15.56.24 (4) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (3) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (6) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (7) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (11)
WhatsApp Image 2025-08-18 at 15.56.25 (13)
WhatsApp Image 2025-08-18 at 15.56.25 (14)
WhatsApp Image 2025-08-18 at 15.56.25 (15)
WhatsApp Image 2025-08-18 at 15.56.25 (16)
WhatsApp Image 2025-08-18 at 15.56.25 (17)
previous arrow
next arrow

Client: Ealing Central Library


Project Details:

This project involved the complete strip out and refurbishment of an existing retail unit, with the space reconfigured to accommodate both a new public library and a reduced-size Decathlon retail unit.

The existing unit was fully stripped back before being subdivided to create two separate occupancies. Works included the formation of a new customer entrance, allowing independent access to the new library facility while maintaining access to the retail unit.

The refurbishment incorporated the installation of new flooring and energy-efficient lighting throughout the development, together with the creation of dedicated archive rooms to support the operational requirements of the library.

The completed project successfully transformed the existing retail space into a modern mixed-use facility, providing a new public library alongside a refurbished retail unit within the existing building footprint.

 

Project Works:

Landlord Enabling and Shopfitting

Project Location: Ealing Central Library, Ealing

All Project Photos

More Projects

The Brewery Romford
This exciting opportunity allowed us to build straight out of the ground; a complete build from site clearance, preparation to construction, providing a new KFC Drive-Thru unit.
Read more
Bupa Dental Care
This exciting opportunity allowed us to build straight out of the ground; a complete build from site clearance, preparation to construction, providing a new KFC Drive-Thru unit.
Read more
CBRE Bury St Edmunds
This exciting opportunity allowed us to build straight out of the ground; a complete build from site clearance, preparation to construction, providing a new KFC Drive-Thru unit.
Read more