Customer Support
01923 677184
Office Times
Mon - Fri : 08:30 - 17:30

News

Refurbishment

Broughton Retail Park

This project involved the refurbishment of the Centre Management offices and customer toilet facilities at Broughton Retail Park

1
previous arrowprevious arrow
next arrownext arrow
1
WhatsApp Image 2026-06-23 at 10.16.17 (3)
WhatsApp Image 2026-06-23 at 10.16.17
WhatsApp Image 2026-06-23 at 10.16.18 (2)
WhatsApp Image 2026-06-23 at 10.16.18 (4)
WhatsApp Image 2026-06-23 at 10.16.19 (4)
WhatsApp Image 2026-06-23 at 10.16.20 (4)
WhatsApp Image 2026-06-23 at 10.16.21 (1)
WhatsApp Image 2026-06-23 at 10.16.21 (3)
previous arrow
next arrow

Client: British Land

Project Details:

This project involved the refurbishment of the Centre Management offices and customer toilet facilities at Broughton Retail Park, delivering upgraded office accommodation and modern welfare facilities while maintaining the day-to-day operation of the centre management team.

The existing offices and welfare areas were fully stripped out prior to refurbishment, with the project delivered in two carefully planned phases to allow the client to remain operational throughout the works.

The scope of works included the installation of new energy-efficient lighting and upgraded electrical services, together with a renewable air source heat pump to provide hot water for the office and welfare facilities. A new Heat Recovery Unit (HRU) and air conditioning system were installed to provide efficient heating, cooling and ventilation, improving occupant comfort and overall energy performance.

The customer toilet and shower facilities were completely refurbished, incorporating new vinyl flooring, full-height wall tiling, and the installation of a new IPS system with Vanesta sanitaryware, including basins and urinals.

The office refurbishment included the installation of new carpet flooring, supply and installation of new office furniture in accordance with the architect’s design, full internal redecoration, and the addition of feature timber batten walls and bespoke signage to create a contemporary working environment.

The completed project provides modern, energy-efficient office accommodation and customer welfare facilities, incorporating renewable heating technologies and upgraded building services while ensuring uninterrupted operation throughout the construction programme.

Project Works:

Refurbishment

Project Location: Broughton Retail Park, Chester

All Project Photos

More Projects

The Brewery Romford
This project involved the refurbishment of the Centre Management offices and customer toilet facilities at Broughton Retail Park
Read more
Bupa Dental Care
This project involved the refurbishment of the Centre Management offices and customer toilet facilities at Broughton Retail Park
Read more
CBRE Bury St Edmunds
This project involved the refurbishment of the Centre Management offices and customer toilet facilities at Broughton Retail Park
Read more
Landlord Enabling, Refurbishment

River Island Biggleswade

This project involved the comprehensive strip-out and preparation of a former River Island retail unit to facilitate its transformation into a new PureGym facility.

IMG_6293
previous arrowprevious arrow
next arrownext arrow
IMG_6293
IMG_6315
IMG_0177
IMG_0181
IMG_6313
previous arrow
next arrow

Client: British Land

Project Details:

This project involved the comprehensive strip-out and preparation of a former River Island retail unit to facilitate its transformation into a new PureGym facility.

The works commenced with the complete demolition of the existing store, including the removal of the lift shaft and staircase. All mechanical and electrical services, internal partitions, suspended ceilings, floor coverings, and redundant fixtures were stripped back to create a clean shell ready for redevelopment.

Structural and external refurbishment works included roof and cladding repairs, the recoating of all rainwater gutters, and the respraying of the entire shopfront, including all mullions and frames, to provide a refreshed external appearance. The existing lift pit was infilled, and the entire floor slab was mechanically ground to create a level, high-quality surface suitable for the incoming tenant’s fit out.

To ensure compliance with current building regulations, fire stopping was installed to all perimeter walls, and all existing external signage was carefully removed.

The completed landlord enabling package delivered a fully prepared shell, allowing PureGym to commence its fit out works efficiently and ensuring the unit was ready for its next phase of occupation.

Project Works:

Landlord EnablingRefurbishment

Project Location: Biggleswade

All Project Photos

More Projects

The Brewery Romford
This project involved the comprehensive strip-out and preparation of a former River Island retail unit to facilitate its transformation into a new PureGym facility.
Read more
Bupa Dental Care
This project involved the comprehensive strip-out and preparation of a former River Island retail unit to facilitate its transformation into a new PureGym facility.
Read more
CBRE Bury St Edmunds
This project involved the comprehensive strip-out and preparation of a former River Island retail unit to facilitate its transformation into a new PureGym facility.
Read more
Landlord Enabling

Old Brompton Gate

delivered the structural alterations, infrastructure upgrades and external improvements required to prepare the development for future occupiers.

brompton-gate-portfolio
previous arrowprevious arrow
next arrownext arrow
brompton-gate-portfolio
brompton-gate-portfolio1
previous arrow
next arrow

Client: 

Project Details:

This project comprised a comprehensive landlord enabling package at Bompton Gate, delivering the structural alterations, infrastructure upgrades and external improvements required to prepare the development for future occupiers.

Working under a design and build contract, we collaborated closely with the client to ensure their detailed specification was fully incorporated into the project, delivering a solution tailored to the operational requirements of the development.

The works included the demolition and adaptation of five retail units and two floors of office accommodation, creating flexible commercial spaces ready for tenant fit out. Extensive structural alterations were undertaken to improve circulation throughout the building, enhancing accessibility and the overall functionality of the development.

A key feature of the project was the installation of a new feature shopfront, incorporating high-quality brass detailing and Portland stone finishes to provide an attractive and contemporary façade.

To improve accessibility and servicing, a new external lift shaft was constructed, complete with the installation of a DDA-compliant goods lift. In addition, comprehensive utility enabling works were carried out, including the provision of new power, water and BT services, ensuring the building was fully prepared for future occupation.

The completed landlord enabling works successfully transformed the property into a modern, adaptable commercial development, providing high-quality retail and office accommodation ready for the next phase of occupation.

Project Works:

Landlord Enabling

Project Location: Old Brompton Gate

All Project Photos

More Projects

The Brewery Romford
Delivered the structural alterations, infrastructure upgrades and external improvements required to prepare the development for future occupiers.
Read more
Bupa Dental Care
Delivered the structural alterations, infrastructure upgrades and external improvements required to prepare the development for future occupiers.
Read more
CBRE Bury St Edmunds
Delivered the structural alterations, infrastructure upgrades and external improvements required to prepare the development for future occupiers.
Read more
Landlord Enabling, Shopfitting

ESBC Library

Refurbishment of an existing retail unit, with the space reconfigured to accommodate both a new public library and a Decathlon retail unit

WhatsApp Image 2025-08-18 at 15.56.23
previous arrowprevious arrow
next arrownext arrow
WhatsApp Image 2025-08-18 at 15.56.23
WhatsApp Image 2025-08-18 at 15.56.24 - Copy
WhatsApp Image 2025-08-18 at 15.56.24 (1)
WhatsApp Image 2025-08-18 at 15.56.24 (4) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (3) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (6) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (7) - Copy
WhatsApp Image 2025-08-18 at 15.56.25 (11)
WhatsApp Image 2025-08-18 at 15.56.25 (13)
WhatsApp Image 2025-08-18 at 15.56.25 (14)
WhatsApp Image 2025-08-18 at 15.56.25 (15)
WhatsApp Image 2025-08-18 at 15.56.25 (16)
WhatsApp Image 2025-08-18 at 15.56.25 (17)
previous arrow
next arrow

Client: British Land


Project Details:

This project involved the complete strip out and refurbishment of an existing retail unit, with the space reconfigured to accommodate both a new public library and a reduced-size Decathlon retail unit.

The existing unit was fully stripped back before being subdivided to create two separate occupancies. Works included the formation of a new customer entrance, allowing independent access to the new library facility while maintaining access to the retail unit.

The refurbishment incorporated the installation of new flooring and energy-efficient lighting throughout the development, together with the creation of dedicated archive rooms to support the operational requirements of the library.

The completed project successfully transformed the existing retail space into a modern mixed-use facility, providing a new public library alongside a refurbished retail unit within the existing building footprint.

 

Project Works:

Landlord Enabling and Shopfitting

Project Location: Ealing Central Library, Ealing

All Project Photos

More Projects

The Brewery Romford
Refurbishment of an existing retail unit, with the space reconfigured to accommodate both a new public library and a Decathlon retail unit
Read more
Bupa Dental Care
Refurbishment of an existing retail unit, with the space reconfigured to accommodate both a new public library and a Decathlon retail unit
Read more
CBRE Bury St Edmunds
Refurbishment of an existing retail unit, with the space reconfigured to accommodate both a new public library and a Decathlon retail unit
Read more
Shopfitting

Toolstation Pineham

We were appointed to build and deliver the fit-out of the 464,000 Sq. ft. warehouse and proposed 2,153 Sq. ft. flammable store unit.

pineham-toolstation4
previous arrowprevious arrow
next arrownext arrow
pineham-toolstation4
pineham-toolstation3
pineham-toolstation2
pineham-toolstation
previous arrow
next arrow

Client: 

Project Details:

Fit-out of a new Toolstation distribution centre.

Overall Project Value: £30m.

Capital Project value £2.3m

We were appointed to build and deliver the fit-out of the 464,000 Sq. ft. warehouse and proposed 2,153 Sq. ft. flammable store unit.

Alongside the unit build, the works comprised of the coordination and implementation of Mechanical & Electrical services, CCTV and Security; Fire alarms, sprinklers and racking.

A goods lift was installed and mezzanine constructed. Facilities included a kitchen and Driver hub fit-out. The project had variations and design changes however these were accommodated and managed well achieving the clients’ satisfaction and approval for a successful delivery.

 

Project Works:

Shopfitting

Project Location: Toolstation, Prologis Park, Pineham

All Project Photos

More Projects

The Brewery Romford
We were appointed to build and deliver the fit-out of the 464,000 Sq. ft. warehouse and proposed 2,153 Sq. ft. flammable store unit.
Read more
Bupa Dental Care
We were appointed to build and deliver the fit-out of the 464,000 Sq. ft. warehouse and proposed 2,153 Sq. ft. flammable store unit.
Read more
CBRE Bury St Edmunds
We were appointed to build and deliver the fit-out of the 464,000 Sq. ft. warehouse and proposed 2,153 Sq. ft. flammable store unit.
Read more
Landlord Enabling

The Range Eastbourne

Alteration and subdivision of an existing retail unit to create two separate units

1
previous arrowprevious arrow
next arrownext arrow
1
2
3
4
previous arrow
next arrow

Client: 

 

Project Details:

This project involved the alteration and subdivision of an existing retail unit to create two separate units, together with external refurbishment works to enhance the appearance of the retail park.

The existing retail range was stripped out before the unit was divided into two independent retail spaces. New shopfronts were installed to both units, along with a new full-height internal party wall to provide the required separation between occupancies.

Externally, the existing cladding was repaired where required and fully resprayed to refresh the building’s appearance. A new totem sign was installed to improve visibility and wayfinding within the retail park.

The works also included the removal of the existing signage, the installation of new secondary steelwork to support replacement signage, and all associated making good works to complete the external refurbishment.

 

Project Works:

Landlord Enabling

Project Location: The Range, Eastbourne

All Project Photos

More Projects

The Brewery Romford
This Capital Group project involved the alteration and subdivision of an existing retail unit to create two separate units
Read more
Bupa Dental Care
This Capital Group project involved the alteration and subdivision of an existing retail unit to create two separate units
Read more
CBRE Bury St Edmunds
This Capital Group project involved the alteration and subdivision of an existing retail unit to create two separate units
Read more
Giltbrook Shopping Centre
Landlord Enabling

Giltbrook Shopping Park

Extensive reconfiguration of an existing commercial unit to create two separate retail spaces.

1
previous arrowprevious arrow
next arrownext arrow
1
IMG_4931
IMG_4934
IMG_4940
IMG_4946
IMG_4971
IMG_4984
previous arrow
next arrow

Client: British Land

Project Details:

This project involved the extensive reconfiguration of an existing commercial unit to create two separate retail spaces, providing a new ground floor unit for PureGym and a first-floor unit for Bensons for Beds.

A new structural mezzanine floor was installed to divide the building into two independent units. The mezzanine was constructed with the appropriate perimeter cavity barriers to achieve the required acoustic and fire performance, ensuring effective sound insulation and fire compartmentation between the gym and the retail space above.

The external façade was upgraded with the installation of new glazed shopfronts, complete with new entrance doors and feature canopies, enhancing both the appearance and functionality of the building. Structural alterations included adjustments to the secondary steelwork to accommodate the new layout, alongside rainwater pipe diversions to suit the revised building configuration.

To support the operational requirements of Bensons for Beds, a new back-of-house staircase and a Stannah goods lift were installed, providing safe and efficient access for deliveries and stock movement to the first floor.

External refurbishment works included cladding repairs and replacements, the application of new white lining, and the replacement of the existing balustrade to the 1st floor car park, improving both the safety and overall appearance of the development.

The completed landlord works successfully transformed the property into two modern, fully functional commercial units, ready for occupation by their respective tenants.

 

Project Works:

Landlord Enabling

Project Location: Giltbrook Shopping Park

All Project Photos

More Projects

The Brewery Romford
This Capital Group project involved the extensive reconfiguration of an existing commercial unit to create two separate retail spaces
Read more
Bupa Dental Care
This Capital Group project involved the extensive reconfiguration of an existing commercial unit to create two separate retail spaces
Read more
CBRE Bury St Edmunds
This Capital Group project involved the extensive reconfiguration of an existing commercial unit to create two separate retail spaces
Read more
Design & Build

The Brewery Romford

We transformed the Arcade place into a bright space that links the shopping centre to the busy South street.

brewery2
previous arrowprevious arrow
next arrownext arrow
brewery2
brewery4
brewery6
brewery5
previous arrow
next arrow

Client: Schroders

Schroders plc is a British multinational asset management company headquartered in London.

Project Details:

We transformed the Arcade place into a bright space that links the shopping centre to the busy South street.

Existing improvement works included; repaving, repainting, cladding cleaning and removal of graffiti on the brick walls.

We then installed a brand-new Steel panelled staircase, bespoke seating benches and planters, High- and low-level lighting and Signage throughout.

The space is now light and elevated, with a strong sense of LED lighting to create a safe atmosphere for the walk through at night.

 

Project Works:

Design & Build

Project Location: the Brewery, Romford

All Project Photos

More Projects

The Brewery Romford
The Capital Group transformed the Arcade place into a bright space that links the shopping centre to the busy South street.
Read more
Bupa Dental Care
The Capital Group transformed the Arcade place into a bright space that links the shopping centre to the busy South street.
Read more
CBRE Bury St Edmunds
The Capital Group transformed the Arcade place into a bright space that links the shopping centre to the busy South street.
Read more
Landlord Enabling

M&S Luton

Bramingham Business Park, Enterprise Way, Luton LU3 4BU
The unit, which was once a Homebase, needed stripping out and existing facades demolishing before preparing for the Main works.

M&S Luton
M&S Luton
previous arrowprevious arrow
next arrownext arrow
M&S Luton
1
2
3
4
5
6
previous arrow
next arrow

Client: LondonMetric

London Metric

LondonMetric is a FTSE 100 real estate company that owns £7 billion of structurally supported assets.

Project Details:

The unit, which was once a Homebase, needed stripping out and existing facades demolishing before preparing for the Main works.

Groundworks started immediately, with drainage routes needing to be rerouted, new footings for the trolley bays, a tiled entrance, and the car park needing re-tarmacking.

We installed a new roof, Kingspan cladding fixed onto a new steel frame and a rear canopy, which overhangs the new scissor lift pit. At the rear, the tenant has a new acoustic louvre surrounding the plant area, to ensure neighbours have minimal disruptions.

We introduced glazing and auto bi-parting doors to South-east elevation, and finished the rest of the facade with bespoke green tiling on the piers.

The finishing touches included a mist coat to the interior walls and ceiling, new SR3 doors, a roller shutter and white lining works.

 

Project Works:

Landlord Enabling

Project Location: Marks & Spencer, Luton

The M&S is at the site of the old Homebase unit. The map location is correct and will be updated with M&S details when the store opens.

All Project Photos

More Projects

River Island Biggleswade
The Capital Group were tasked with stripping out the Homebase shell and enabling for a new M&S store for our client LondonMetric.
Read more
Old Brompton Gate
The Capital Group were tasked with stripping out the Homebase shell and enabling for a new M&S store for our client LondonMetric.
Read more
ESBC Library
The Capital Group were tasked with stripping out the Homebase shell and enabling for a new M&S store for our client LondonMetric.
Read more
Shopfitting

Currys Sydenham

Unit 5, Bell Green Retail Park, London SE26 4PR
Downsize and Re-fit of an existing curry’s store

2
previous arrowprevious arrow
next arrownext arrow
2
3
5
6
4
7
previous arrow
next arrow

Client: Currys

Client: Currys

Currys is a leading retailer of electronic products in the UK and Ireland. They sell a wide range of technology, including white goods, consumer electronics, computers, and mobile phones.

.

Project Details:

Downsize and Re-fit of an existing curry’s store

Firstly, the team got underway with strip out works; the removal of the existing store furniture, removal of old signage and a new party wall was constructed to split the unit into two.

We then created a transformed FOH area, with a new glazed lobby, grind/shot blasted floor and auto bi-parting doors. Externally, we installed new signage to the unit and a brise soleil.

Back of house, we conducted a complete fit out; We created spaces for the Currys staff. The team now have new bathrooms, amenity areas and new kitchens. All plumbing works were carried out, tape/jointed stud partition walls, along with a suspended ceiling grid.

 

Project Works:

Shopfitting

Project Location: Currys, Sydenham

All Project Photos

More Projects

ESBC Library
The Capital Group were tasked with the downsize and re-fit of an existing curry’s store in Sydenham.
Read more
Toolstation Pineham
The Capital Group were tasked with the downsize and re-fit of an existing curry’s store in Sydenham.
Read more
Currys Sydenham
The Capital Group were tasked with the downsize and re-fit of an existing curry’s store in Sydenham.
Read more